macjedai
About
- Banned
- Username
- macjedai
- Joined
- Visits
- 0
- Last Active
- -
- Roles
- member
- Badges
- 0
- Posts
- 263
Reactions
Comments
-
Quote: Originally posted by Amorph IBM claims to have protoypes of the next generation. It's usually 12-18 months from first silicon to production, no? Now the question would be, do they mean the 90nm 970, or the POWER5-derived CPU we're calling …
-
Quote: Originally posted by Programmer Did I miss something and IBM has even mentioned the number "980"? Last I heard it was entirely rumour and speculation, but people seem to be treating it an awful lot like fact. The POWER5 is fact, but that…
-
Quote: Originally posted by RBR The 980 is the "real deal" even though the 970 is not too shabby, although it seems likely that Apple & IBM will have one 970 speed bump and then the 970+ before the 980 is debuted in a PowerMac. We shall see …
-
Yevgeny, Glad you understand. Unfortunately, I don't have access to timelines for the 980 ... yet (like I did with GUL) ... and even then, they were old (hence my not having complete trust in them, schedules slip sometimes ... fortunately I was "…
-
Quote: Originally posted by Outsider No, the best analogy is the G4 was like a Ferrari with a 2 gear transmission. Both gears in reverse (lo and hi)???
-
Quote: Originally posted by DHagan4755 How does this sound? (snip) Like you're "sandbagging" a little bit.
-
Quote: Originally posted by qazII When is the last time a major piece of Apple hardware was announced by an Apple executive other than Steve? An hour is barely enough for a demonstration of a slightly newer Panther build and a rehash of the G5. …
-
Quote: Originally posted by k_killmore WUT WUT HOLLABACK edit: I designed it for maximum flow. The more stickers ... the faster it goes!
-
Quote: Originally posted by MacRonin powdercoat the case black... make the Apple logos on the side glow when the unit is powered up... Oooh, I like that one!
-
This idea is from waaaay out in left field, but wouldn't it be funny to have a SJ walk on into the keynote, just to announce new PowerBooks. It would definitely throw everyone a curve.
-
Quote: Originally posted by Outsider (snip) Personally I think that Apple will do quad when the 9X0 series goes dual core. Too much of a complicated motherboard and chipset otherwise. In a word ... yes
-
Quote: Originally posted by Yevgeny Do you have a link for that timeframe? This is super important because a 970 portable is dependent on the 90 nm die shrink. Not one you can access!
-
Quote: Originally posted by The Mactivist I don't buy this ramping up production stuff. I think personally (based on nothing but speculation) that they likely have the next speed bumps ready and are sitting on it for economic reasons - IE - new c…
-
Quote: Originally posted by Telomar POWER chips and the PPC 970 + successors will be aimed at different markets. The PPC 970 will really help IBM compete better with the Xeon + Opteron market while the POWER series continues to play higher up th…
-
Quote: Originally posted by Matsu What are the odds that IBM could make a transition of their POWER business to GPuL type chips? mebbe not all of their business, but a large chunk of it? If POWER chips cost lots and lots to make, mebbe they…
-
Quote: Originally posted by Booga Considering that the rest of the industry doubles performance every 18 months, a 50% increase in 12 months isn't exactly good news. Why the "wow"? You're making the mistake of associating performance with MH…
-
Quote: Originally posted by Hobbes Those were the days. Different game now with IBM. I'm with you! Those were the days , let them Rest in Peace . It's a different "game" now ... with IBM providing the CPUs. I wouldn't "rule out" du…
-
The 1.6GHz, 1.8GHz, and the dual 2.0GHz each have different arrangements of PCI. The 1.6 is stuck at normal PCI (33MHz) The 1.8 has a combination PCI-X speeds, forget if it is 2 100MHz and one 133MHz, or vice versa. The Dual 2.0 has all 133…
-
I'm only speculating, but I think the only thing "new" you're gonna see (this year) is upgraded PowerBooks (maybe after September). As an "outside" bet ... you may get a G5 in them when the 15.4 goes Al. The remaining G4 towers will fill the "hole"…