  • Apple's Campus 2 repeatedly delayed by emphasis on perfecting small details, profile says

    So, at least one contractor was complaining that the Apple team was refining small, normally "inconsequential" details. Apparently the details were not inconsequential to the Apple team. Without detailed specific examples (photographic backup would be helpful), it is impossible to determine if the Apple managers and/or architects were indeed demanding things beyond the drawings and specifications or the contractors were not following the contract. The former would result in change orders that cost Apple and the latter typically is usually on the contractors dime, except it could become a bit more complicated when there is multiple prime contracts, as this massive project certainly has.

    The very first example -- "the main ring's polished concrete ceiling panels" -- is likely a poor description of the actual construction, as is "inside and out". In essence, every single part of the construction is approved by the contractor (though it seams they typically overlook things to do the minimal amount of work and still get paid) and the architect and the owner's agents.

    Apple is correct that any change in flooring is a potential trip hazard. Apple's obsession with doorways very well could have been a specifications issue where they did not know what they were getting from the design team. Interior thresholds are unnecessary, since automatic door bottoms perform many of the same functions. It is unclear what "stuff that's never been done before" is referring. But I have heard a few times similar statements, such as, "I have been doing it like this for 20 years..." Where the person making the statement either does not know or accept the fact that standards are constantly changing. ADA allows a 1/4-inch high abrupt change in flooring height and a maximum 1/2-inch height in a threshold, but I have known numerous contractors who did not know this.

    I find it very believable that Apple clashed with the fire department about code required exit sign locations and signage at stairs and elevators. I also would not be surprised if the discussions also included audio/visual notification devices, sprinkler head and smoke detector locations. These are all ugly things if you are a minimalist. I am always amused when in a haunted Disney ride and see the illuminated exit signs.

    Maybe the sample door handle was just too heavy because it took construction crews to present it to Apple.×Page There are several construction tolerances less than 1/8-inch. The industry tolerance for door machining to receive door hardware is 1/32-inch.

    I have been a CCS for too many years.