plan-b
About
- Username
- plan-b
- Joined
- Visits
- 0
- Last Active
- -
- Roles
- member
- Badges
- 0
- Posts
- 36
Reactions
Comments
-
Quote: Originally posted by PB I wouldn't say so. nVidia cards are known to be strong in OpenGL. And that's what xbench lets you understand. For example, look at the OpenGL results for a 12" Powerbook 867 MHz, with a Geforce4 Go, and a 15" Powerb…
-
Quote: Originally posted by Gon The 5200 is much like Radeon 9200. Many people think Apple should have chosen the 9200 for 12" Powerbook in the first place. . So basically the nvidia cards are shite???? are they bad enough to not both…
-
i am truely praying for powerbook g5s and they defo will Noy suck they will rock....... i am so so tempted to go and get 12 inch powerbook now but really dont want to be screwed by new updates... if i needed one i would get one but its more of a …
-
Quote: Originally posted by Messiahtosh While people have agreed that the Euro stores having all these models available means that there is massive inventory clearing going on, I dont think it means PowerBook G5's. all im think is why clear a…
-
Quote: Originally posted by pscates you're simply treading Plan-B territory. heh heh think about now is the tme to make an appology but 3200 for a 3ghz..... i doubt they will have a 3 ghz till later on like end of summer i wou…
-
Quote: Originally posted by nsousansousa So do I... i surely hope so...... 2499us ill take ten please (although i have no idea why)
-
Quote: Originally posted by eprom And about bloody time it is too..... here here.........
-
Quote: Originally posted by concentricity just for the record, Intel has multiple 3.4GHz processors out. the 3.06 is old. it was the first released with HT. thanks for that wasnt quite sure with intel and really didnt want to look it up …
-
Quote: Originally posted by kupan787 I think this calls for a public banning. All in favor? aye
-
I should imagine that with them only having a single (think im right in saying this) 3.06 proccesor available top range....hows that going to look pitched against dual 3ghz ( and its beautiful design) so i should think they will start calling them t…
-
over a hundred replys to this bullcrap...... tut tut tut lock it up
-
Quote: Originally posted by Messiahtosh You are borderline retarded. Apple does not have the ability to ship the volume required to achieve a 10% market share within a single year. yeah your really starting to piss me off...... really not …
-
Quote: Originally posted by BZ You had me till the 10%. Apple might be able to grow to 10% in ten years, but not with high speed, high priced workstations. They will do with with consumer consumables. BZ i didnt actual say there defo go…
-
Quote: Originally posted by The General Never said I was a nice person.. on the contrary, I am a complete and utter A@!#*$@ how true....... i know its a long time to wait as for more hurt than good.... well the powerbooks need milki…
-
Quote: Originally posted by ipodandimac apple literally cannot survive as a compny if they dont release new computers. theyre coming. absolutely....... correct
-
oops oops oops ....... sorry sorry sorry i ment 10.3.4 sorry sorry sorry
-
blah blah blah........ all updated at one.....blah blah hugh wwdc ....blah blah blah powermac.....blah imacs...blah blah blah screens blah blah powerbooks blah blah
-
Quote: Originally posted by ~ufo~ hey now hold yer horses... what's all this stuff I hear about 10.4 ? I've just been running panther for a few weeks..... when is 10.4 supposed to hit the strizzle ? Yarrrrrrrrrr prob start shiping aug…
-
Quote: Originally posted by The General hmmmm, plan-b.. could it bee.. that plan-b.. bee the retarded inbred cousin of ... WORKER BEE..... of course, we all know since he is the retarded, and in-bred cousing, this 'b' ca…
-
Quote: Originally posted by DHagan4755 PLAN-B Are you saying that Apple is going to wait a whole year to update Power Macs? (June 2003-June 2004) I think, if you recall they have 1.8 dual processor -------- The Machine apple brough…